CP1002 Screening Determination
CP1002 Cushaling-Newbridge 110kV Uprate Project [Exempted
Development] Counties Kildare and Offaly.
Secondary Fuel Test Compensation Template V4
Compensation template for generators which have undergone
secondary fuel testing on instruction from the National Control
Centre
EirGrid TSO Annual Compliance & Assurance Officer Report 2022
Condition 21A of EirGrid’s Transmission System Operator
Licence (the Licence) requires the Compliance &
Assurance Officer to report at least annually to the
directors of the Licensee on his activities during the
period covered by the report and the investigations he has
conducted and shall specifically include the
Compliance & Assurance Officer’s assessment of the
compliance of the Licensee with the requirements of
Conditions
System Margins Outlook Report 11.08
The System Margins Outlook Report will be published every
Monday and Friday, excluding bank holidays. The report will
provide market participants with information on the
anticipated availability of dispatchable generation capacity
to meet peak demand each day over the week ahead; the
average and lower confidence renewables forecast; and the
availability of the East-West Interconnector and the Moyle
Interconnector with Great Britain to support trades - should
these be required to meet power system requirements when
PR5 TSO/TAO Multi Year Plans 2024-2028 Call for Input Consultation Paper
The Call for Input Consultation invites stakeholder views on
and input into the proposed approach in advance of EirGrid's
finalisation of the PR5 TSO/TA0 Multi Year Plans for 2024-2028.
DSO-TSO Multi-Year Plan 2023-2027 Consultation Response Paper
EirGrid and ESB Networks, in their respective capacities as
Transmission System Operator (TSO) and Distribution System
Operator (DSO), are now jointly publishing their response to
the consultation on the DSO/TSO Multi-Year Plan 2023 – 2027.
DSO/TSO Multi-Year Plan 2023 - 2027
EirGrid and ESB Networks, in their respective capacities as
Transmission System Operator (TSO) and Distribution System
Operator (DSO), are now publishing the revised Multi-Year plan
for 2023-2027.
Proposed Testing Tariff for Calendar year 2024
Yearly proposal for industry comments on Testing Tariff for
Calendar year 2024
PR5 TSO Multi Year Plans 2024-2028 Call for Input Consultation Paper
The Call for Input Consultation invites stakeholder views on
and input into the proposed approach in advance of EirGrid's
finalisation of the PR5 TSO Multi Year Plans for 2024-2028.
BGE response TSO PR5 Strategic Objectives Multi-Year Plan 2023-2027
Bord Gáis Energy's (BGE) response to the consultation on the
TSO PR5 Strategic Objectives Multi-Year Plan 2023-2027.