EirGrid Stakeholder Engagement Report 2022 Consultation Response Paper
This paper (the ‘Consultation Response’) provides a detailed
overview to the feedback received during the
public consultation of EirGrid’s review of stakeholder
engagement activity during 2021. This document
includes EirGrid’s response to feedback received to our
draft report. The consultation on the draft
Stakeholder Engagement Report ran from the 27th April to 8th
May 2023.
EirGrid Market Operator Annual Compliance and Assurance Officer Report 2022
Condition 9(3) of EirGrid’s Market Operator Licence (the
Licence) requires the licensee to report to the
Commission annually specifying the measures taken and the
level of compliance to ensure that
discriminatory conduct by it or its employees is prevented.
CP1390 Screening Determination
CP1390 Maynooth-Rinawade - 110 kV Uprate Project [Exempted
Development] County Kildare.
CP1086 Screening Determination
CP1086 Transformer Works at Dunstown and Woodland 400 kV
Stations [Exempted Development] County Kildare and County
Meath
CP1182 Screening Determination
CP1182 Transformer Restoration Project [Exempted Development]
CP1391 Screening Determination
CP1391 Derryiron-Maynooth-Timahoe 110kV Uprate Project
[Exempted Development] Counties Kildare and Offaly.
CP1002 Screening Determination
CP1002 Cushaling-Newbridge 110kV Uprate Project [Exempted
Development] Counties Kildare and Offaly.
Secondary Fuel Test Compensation Template V4
Compensation template for generators which have undergone
secondary fuel testing on instruction from the National Control
Centre
EirGrid TSO Annual Compliance & Assurance Officer Report 2022
Condition 21A of EirGrid’s Transmission System Operator
Licence (the Licence) requires the Compliance &
Assurance Officer to report at least annually to the
directors of the Licensee on his activities during the
period covered by the report and the investigations he has
conducted and shall specifically include the
Compliance & Assurance Officer’s assessment of the
compliance of the Licensee with the requirements of
Conditions
System Margins Outlook Report 11.08
The System Margins Outlook Report will be published every
Monday and Friday, excluding bank holidays. The report will
provide market participants with information on the
anticipated availability of dispatchable generation capacity
to meet peak demand each day over the week ahead; the
average and lower confidence renewables forecast; and the
availability of the East-West Interconnector and the Moyle
Interconnector with Great Britain to support trades - should
these be required to meet power system requirements when