Contracted TSO Wind Farms as of 23 August 2021
Updated report, re connected projects
110 kV AIS Substation Layout Drawings – Single bay non-extendable (XDN-LAY-ELV-STND-H-003-R04)
Design Standard drawings showing layout of 110 kV AIS single
bay non-extendable Substation
110 kV AIS C-Type Substation Single Line Diagram (XDN-SLD-STND-H-005-R03)
Design Standard drawings showing single line diagram of 110 kV
AIS C-Type Substation
Q2 2021 ATR Status Update - published 30-July-21
The document provides a quarterly update on ATR completion or
scheduled completion dates, so that generators can track the
status of the ATRs associated with their generation
project(s).
Contracted TSO (Non Wind) Generators as of 9 July 2021
Updated report, re connected projects
Contracted TSO Wind Farms as of 9 July 2021
Updated report, re connected projects
Other System Charges (OSC) Trip Report 2020-21
This report contains a monthly breakdown of the All Island
Trip Charges for the 2020/2021 tariff year.