Contracted TSO Wind Farms as of 03 December 2021
Updated report, re connected projects
TSO-Wind-Contracted-03.12.2021.pdf
Transmission Outage Programme 2021
2021-Transmission-Outage-Programme-(20211201).xlsx
ECP-2.2 Update November 2021
ECP-2.2 Batch Update November 2021
2021-Batch-(ECP-2.2)-Results-Joint-SO-Publication_November-2021_Final.pdf
Contracted TSO (Non-Wind) Generators as of 04 November 2021
Updated report, re connected projects
TSO-NonWind-Contracted-03.11.2021.pdf
Contracted TSO Wind Farms as of 03 November 2021
Updated report, re connected projects
TSO-Wind-Contracted-03.11.2021.pdf
Transmission Outage Programme 2021
2021-Transmission-Outage-Programme-(20211013).xlsx
Contracted TSO Wind Farms as of 29 September 2021
Updated report, re connected projects
TSO-Wind-Contracted-29.09.2021.pdf
Contracted TSO (Non-Wind) Generators as of 29 September 2021
Updated report, re connected projects
TSO-Non-Wind-Contracted-29.09.2021.pdf
ECP-2.1 Update September 2021
Update on ECP-2.1 initial batch November 2020
2020-Batch-(ECP-2.1)-Results-Joint-SO-Publication_September-2021.pdf
Approved 2021/2022 Generator Transmission Use of System (GTUoS) Tariffs Accompanying Note
Approved 2021/2022 Generator Transmission Use of System
(GTUoS) Tariffs Accompanying Note
2122-Approved-GTUoS-Tariffs-Accompanying-Note-v1.0.pdf