Quarterly Imperfections Cost Report Jan – Mar 2021
Quarterly update of factors affecting Imperfections costs
All-Island Network Code Stakeholder Forum - 29 April 2021
All-Island Network Code Stakeholder Forum - 29 April 2021
2021 Q1 ATR Status Update
The document provides a quarterly update on ATR completion
or scheduled completion dates, so that generators can
track the status of the ATRs associated with their
generation project(s).
2024/2025 T-3 Capacity Auction Connection Clinics Invitation
2024/2025 T-3 Capacity Auction Connection Clinics
Invitation
Request for Feedback on Multi-Regional Loose Volume Coupling Cost Benefit Analysis
Information on the request for feedback from market
participants on the proposed introduction of multi-
regional loose volume coupling
Cost Benefit Analysis of Multi-Region Loose Volume Coupling - Analytical Results
Cost Benefit Analysis of Multi-Region Loose Volume
Coupling - Analytical Results
Joint TSO/DSO Group Processing Approach Charging and Rebating Principles
Joint TSO/DSO Group Processing Approach Charging and
Rebating Principles
Transmission Outage Programme 2021
2021 Transmission Outage Programme as at 6th April 2021
Flexible Demand Operating Protocol
This protocol sets out the operational arrangements in
place between the System Operator and the customer for
implementation of Flexible Demand at the customer’s
site(s).
DSU Test Procedure – Capacity Test – 6 Hours
DSU Test Procedure – Capacity Test – 6 Hours