Contracted TSO (Non Wind) Generators as of 03 November 2020
Updated report, re connected projects
Contracted TSO Wind Farms as of 03 November 2020
Updated report, re connected projects
Revision 2 ODS-GFS-00-001 Offshore Substation General Requirements Specification
Offshore substation general requirements specification
EirGrid and SONI Balancing Market Principles Statement V3.1 Consultation Report
Report following consultation with industry on revisions
to the Balancing Market Principles Statement (BMPS).
EirGrid and SONI Balancing Market Principles Statement V4.0
Balancing Market Principles Statement (Version 4.0)
220 kV GIS Substation Layout Drawings – 12 Bay (XDN-LAY-ELEV-STND-F-004-R01)
Design Standard drawings showing layout of 220 kV GIS 12-
bay Substation
220 kV GIS Substation Layout Drawings – 8 Bay (XDN-LAY-ELEV-STND-F-005-R00)
Design Standard drawings showing layout of 220 kV GIS 8-
bay Substation
General Arrangement Earthing Practice
Design Standard showing general arrangement earthing
practice for 110 kV/220 kV/400 kV substations.
Earthing and Lightning Protection
Technical specification covering the technical
requirements of the design, supply at site, installation
and testing of Substation earthing and lightning
protection system.