Skip to main content

Breadcrumb

  1. Back to site
  2. Customer Information
  3. Edit Taxonomy term

Customer Information

Offshore Functional Specifications – TSO Response

  • Read more about Offshore Functional Specifications – TSO Response

Comments and observations on offshore functional
specifications

Offshore-Functional-Specifications-TSO-Response.pdf
EirGrid
Customer Information

ECP-2 Node Assignment Ruleset

  • Read more about ECP-2 Node Assignment Ruleset

This document describes the node assignment rules for
ECP-2
and the principles which informed the establishment of
these
rules. The Node Assignment Rules have been devised by the
System Operators, EirGrid as Transmission System Operator
and ESB Networks as Distribution System Operator.

Node-Assignment-Rules-ECP-2.pdf
EirGrid
Customer Information
Information Note

Approved 2021 Generator Transmission Use of System (GTUoS) Tariffs

  • Read more about Approved 2021 Generator Transmission Use of System (GTUoS) Tariffs

Approved 2021 Generator Transmission Use of System (GTUoS) Tariffs

2021-Approved-GTUoS-Tariffs.pdf
Information Note
Customer Information

2019 Annual Electricity Transmission Performance Report

  • Read more about 2019 Annual Electricity Transmission Performance Report

The CRU as part of its decision paper CER/18/097, decisions 1 and 2, requires the TSO and the TAO to produce joint reports setting out their annual performance in regard to the operation and development of the Transmission System.

Draft-2019-EirGrid-and-ESB-Networks-Electricity-Performance-Report-(APR).pdf
Customer Information
EirGrid

2019 Investment Planning and Delivery Report

  • Read more about 2019 Investment Planning and Delivery Report

The CRU as part of its decision paper CER/18/097, decisions 1 and 2, requires the TSO and the TAO to produce joint reports setting out their annual performance in regard to the operation and development of the Transmission System.

Draft-2019-EirGrid-and-ESB-Investment-Planning-and-Delivery-Report-(IPD).pdf
Customer Information
EirGrid

EBGL Article 18 Local Terms and Conditions Proposal

  • Read more about EBGL Article 18 Local Terms and Conditions Proposal

Document mapping Terms and Conditions and definitions from local rules documents to Electricity Balancing Guideline requirements, for consultation before RA submission.

EBGL-Article-18-Local-Terms-and-Conditions-Proposal.pdf
Customer Information
EirGrid Group

Ruleset for Enduring Connection Policy Stage 2 (ECP-2)

  • Read more about Ruleset for Enduring Connection Policy Stage 2 (ECP-2)

Ruleset for Enduring Connection Policy Stage 2

ECP-2-Ruleset-Final.pdf
Generation
Customer Information

SO Information Note Existing Transfer to ECP-2

  • Read more about SO Information Note Existing Transfer to ECP-2

SO Information Note Existing Transfer to ECP-2

SO-Information-Note-existing-transfer-to-ECP-2.pdf
Customer Information
Generation

ECP-2 Generation Facilities Application Form - PDF Version

  • Read more about ECP-2 Generation Facilities Application Form - PDF Version

ECP-2 Generation Facilities Application Form

ECP-2-Generation-Facilites-Application-Form-Final.pdf
Customer Information
Generation

ECP-2 Generation Facilities Application Form - Word Version

  • Read more about ECP-2 Generation Facilities Application Form - Word Version

ECP-2 Generation Facilities Application Form

ECP-2-Generation-Facilites-Application-Form-Final.docx
Generation
Customer Information

Pagination

  • Previous page
  • Current page 37
  • Next page
Subscribe to Customer Information