Powering Up Dublin: Step 4B Inchicore to Poolbeg Report

Powering Up Dublin (PUD) is a critical programme that will strengthen key electricity infrastructure in Dublin and the surrounding areas, making the city ‘renewable ready’. Dublin’s demand for electricity has grown and will continue to grow in the years ahead as society moves to using electricity for heat and transport. These works allow the country to meet our energy demands now and in the future. This report identifies the Best Performing Option to replace the existing Inchicore to Poolbeg 220 kV circuits 1 & 2 (CP1150 & CP1157).

Strategic Framework for Grid Development in the Southern Region

This Strategic Framework Document allows EirGrid’s current programme of grid development projects to be understood in a regional context, showing the interdependencies of the projects, challenges within the region and how grid development is part of the economic development of the region

Srananagh - Clogher Emerging Best Performing Technology Option Report

Capital Project 1233 is a proposed electricity development that will help to meet a network strengthening need identified in the northwest of the country along the Clogher – Srananagh network corridor. This report is the Emerging Best Performing Technology Option Report for Capital Project 1233. It is intended
to help select the best technology option for the project.

Kildare Dublin Grid Reinforcement Project Step 3 Engagement and Consultation Report July 2025

This report provides a summary of the engagement and consultation activities carried out by EirGrid at Step 3 – “What is the Best Option and What Area Might Be Affected” of the Kildare Dublin Grid Reinforcement Project engagement process and the findings from an independent review of all responses and feedback received. This feedback will be considered by EirGrid as it proceeds to Step 4 - “Where Exactly Should We Build” of the Kildare Dublin Grid Reinforcement Project.

Celtic Interconnector Nuachtlitir 7 - Bealtaine 2025

Bhain an tionscadal garsprioc shuntasach amach i mí an Mhárta, agus oibreacha riachtanacha duchtála cábla ar tír curtha i gcrích go rathúil ag an gcuid trá de Thrá an Chaisleáin Chria, Eochaill. An méid a bhí i gceist leis na hoibreacha ná píobáin duchtála a ardú go sioncronach chuig an gcófradhamba (trinse) ag cúig chraein, sular íslíodh iad in áit sa trinse. Rinneadh na beacht-oibreacha seo idir fuinneoga taoide na trá

An tIarthuaisceart á Chumhachtú - Forléargas Tionscadail - Meán Fómhair 2025

Is ionann An tIarthuaisceart Á Chumhachtú agus clár oibre beartaithe atá ceaptha chun comhtháthú foinsí breise in-athnuaite ar an eangach a chumasú, lena mbeifear in ann freastal ar an méadú níos airde ar leictreachas a bheidh ann san Iarthuaisceart amach anseo. Leis sin, cuirfear le fás agus forbairt an gheilleagair ar fud an réigiúin.

Powering Up the North West - Project Overview September 2025

Powering Up the North West is a proposed programme of works designed to enable the integration of more renewable energy sources into the grid which will also enable higher electricity demand to be supplied in the North West in the future. This will help drive economic growth and development across the region.