Meath-Tyrone 400kV Interconnection Development Tower Outline Evaluation and Selection Report

EirGrid and NIE have commissioned ESBI, SAE Power Lines, and AECOM (formally know as Faber
Maunsell) to perform various studies on a number of 400kV tower designs to determine which design is
technically and aesthetically suitable to employ on the new Meath-Tyrone 400kV Interconnection
Development.

Tower Outline Evaluation and Selection Report.pdf

Assessment of the Technical Issues relating to Significant Amounts of EHV Underground Cable in the All-island Electricity Transmission System Summary Report

THE REPORT AND THE CONSULTANT: The contract for producing the Technical
Report on the use of extra high voltage (EHV) cables in the island networks was
awarded to Tokyo Electric Power Company (TEPCO) following an open
tendering process.

2-TEPCO-Summary-Report.pdf

Assessment of the Technical Issues relating to Significant Amounts of EHV Underground Cable in the All-island Electricity Transmission System Public Report

TEPCO has carried out the following studies in order to evaluate the effect of cable
installations on the NIE/EirGrid network:
Part 1: Evaluation of the potential impact on the all-island transmission system of significant
lengths of EHV underground cable, either individually or in aggregate
Part 2: Feasibility study on the 400 kV Woodland � Kingscourt � Turleenan line as AC EHV
underground cables for the entire length
Part 3: Feasibility study of the 400 kV Woodland � Kingscourt � Turleenan line as mixed OHL /
underground cable

2-TEPCO-PublicReport.pdf

Assessment of the Technical Issues relating to Significant Amounts of EHV Underground Cable in the All-island Electricity Transmission System Public Report November 2009

TEPCO has carried out the following studies in order to evaluate the effect of cable
installations on the NIE/EirGrid network:
Part 1: Evaluation of the potential impact on the all-island transmission system of significant
lengths of EHV underground cable, either individually or in aggregate
Part 2: Feasibility study on the 400 kV Woodland � Kingscourt � Turleenan line as AC EHV
underground cables for the entire length
Part 3: Feasibility study of the 400 kV Woodland � Kingscourt � Turleenan line as mixed OHL /
underground cable

Tepco Report.pdf

LAOIS � KILKENNY REINFORCEMENT PROJECT: PROPOSED LAOIS�KILKENNY ELECTRICITY REINFORCEMENT SCHEME PUBLIC CONSULTATION ON A CONSTRAINTS STUDY AREA

Constraints map for public input by way of comments, information, submissions or queries.The input into the
constraints map will allow the procedure to the next stage in the process which is to identify potential route corridors within the study area.

Appendix F-1 Newspaper Notice 1 - Oct 2009.pdf

Investigating the Impact of HVdc Schemes in the Irish Transmission Network Report R1116.03.04 Final Report

The purpose of this study is to investigate the impact of HVdc schemes in the Irish Network and to compare these HVdc schemes to equivalent AC solutions for various scenarios. Four scenarios were investigated to compare various AC and HVdc schemes,

3-TRANSGRID-REPORT.pdf