Strategic Social Impact Assessment Scoping Report Kildare-Meath Grid Upgrade Step 3

This Social Impact Assessment Scoping Report has been
prepared to identify the social impacts that could occur
as a result of the Kildare-Meath Grid Upgrade / CP966
project and to assess the three technologies under
consideration.

Cable integration studies for Kildare-Meath Grid Upgrade Step 3

The studies associated with cable integration cover:
1- Steady state load flow studies for the determination of reactive
compensation
2- Frequency domain studies to establish harmonic voltage magnification and
potential breaches, and
3- Time domain studies to check possible temporary overvoltages (TOV) and
zero-cross missing phenomenon during cable energisation.