Joint TSO & TAO Electricity Transmission Performance Report 2017
Joint TSO/TAO Report setting out EirGrid and ESBN’s performance in developing, operating and maintaining the transmission system
Project Brochure - Intel Project
Brochure for the Intel Project - CP1029
General Environmental Constraints Map - Intel Project
Map showing the general environmental constraints - Intel Project
Substation Locations - Options 1, 2 and 3 - Intel Project
Map showing all possible substation locations - Intel Project
Substation Location Option 3 - Intel Project
Map showing option 3 for proposed substation - Intel Project
Substation Location Option 2 - Intel Project
Map showing option 2 for proposed substation - Intel Project
Substation Location Option 1 - Intel Project
Map showing option 1 for proposed substation - Intel Project
Study Area Map - Intel Project
Map showing the study area for Intel Project CP1029
TES 2017 System Needs Assessment Summary Booklet - Final
TES 2017 System Needs Assessment summary booklet - Final
TES 2017 System Needs Assessment - Final
TES 2017 System Needs Assessment - Final