Transmission Development Plan 2016-2026
The Transmission Development Plan (TDP) sets out the transmission projects we are developing or intending to develop for the period of the Plan. It also contains information about the needs and drivers of the projects. The projects are integral to ensuring an adequate transmission network is in place.
EWIC Draft Access Rules v5 for Consultation
EWIC Draft Access Rules v5 for Consultation
EWIC Draft Charging Methodology Statement v3 for consultation
EWIC Draft Charging Methodology Statement v3 for consultation
EWIC and Moyle – Draft Access Rules and Charging Methodology – Consultation Paper 2017
EWIC and Moyle – Draft Access Rules and Charging Methodology – Consultation Paper 2017
Land Report 1 - Celtic Interconnector Feasibility Study – Converter Station Site & Route Identification in Ireland (and associated mapping)
Land Report 1 - Celtic Interconnector Feasibility Study – Converter Station Site & Route Identification in Ireland (and associated mapping)
Celtic Interconnector – Land Report 1 – East Cork Connection Point - Landfall Options Map
Celtic Interconnector – Land Report 1 – East Cork Connection Point - Landfall Options Map
Celtic Interconnector – Land Report 1 – East Cork Connection Point - Converter Station Options Map
Celtic Interconnector – Land Report 1 – East Cork Connection Point - Converter Station Options Map
Celtic Interconnector – Land Report 1 – East Cork Connection Point - Underground Cable Route Options Map
Celtic Interconnector – Land Report 1 – East Cork Connection Point - Underground Cable Route Options Map
Celtic Interconnector – Land Report 1 – East Cork Connection Point - Water Map
Celtic Interconnector – Land Report 1 – East Cork Connection Point - Water Map
Celtic Interconnector – Land Report 1 – East Cork Connection Point - Land Use Map
Celtic Interconnector – Land Report 1 – East Cork Connection Point - Land Use Map