220 kV GIS Substation Layout Drawings – 8 Bay (XDN-LAY-ELEV-STND-F-005-R00)

  • Read more about 220 kV GIS Substation Layout Drawings – 8 Bay (XDN-LAY-ELEV-STND-F-005-R00)

Design Standard drawings showing layout of 220 kV GIS 8-
bay Substation

XDN-LAY-ELV-STND-F-005-R00.pdf
EirGrid
Customer Information

General Arrangement Earthing Practice

  • Read more about General Arrangement Earthing Practice

Design Standard showing general arrangement earthing
practice for 110 kV/220 kV/400 kV substations.

XDS-DGA-00-004-R04.pdf
Customer Information
EirGrid

Earthing and Lightning Protection

  • Read more about Earthing and Lightning Protection

Technical specification covering the technical
requirements of the design, supply at site, installation
and testing of Substation earthing and lightning
protection system.

XDS-GFS-12-001-R3.pdf
Customer Information
EirGrid

Offshore Functional Specifications – TSO Response

  • Read more about Offshore Functional Specifications – TSO Response

Comments and observations on offshore functional
specifications

Offshore-Functional-Specifications-TSO-Response.pdf
EirGrid
Customer Information

CP1021 - East Meath North Dublin Project Brochure

  • Read more about CP1021 - East Meath North Dublin Project Brochure

CP1021 - East Meath North, Dublin, Project, Brochure

EirGrid-CP1021-East-Meath-North-Project-Brochure.pdf
Grid Development
EirGrid

CP1021 - Step 2 - Part A - Options Report

  • Read more about CP1021 - Step 2 - Part A - Options Report

CP1021 - Step 2 - Part A - Options Report

CP1021-Step-2-Part-A-Options-Report.pdf
Grid Development
EirGrid

CP1021 - Step 1 - Needs Report

  • Read more about CP1021 - Step 1 - Needs Report

CP1021 - Step-1 - Needs Report

CP1021-Step-1-Needs-Report.pdf
EirGrid
Grid Development

Innovation Report 2019

  • Read more about Innovation Report 2019

Report on Innovation projects (i) being initiated, (ii) projects that are in progress, and (iii) projects that have completed, including relevant, proportionate evidence on the scope, cost, rationale for and impacts of each project with either activity or impacts during the reporting year.

2019-Innovation-Report.pdf
EirGrid
TSO Regulatory Publications
2019

Step 3 Emerging Best Performing Options Report Kildare Meath Grid Upgrade

  • Read more about Step 3 Emerging Best Performing Options Report Kildare Meath Grid Upgrade

Step 3 Emerging Best Performing Options Report Kildare Meath
Grid Upgrade

Step-3-Emerging-Best-Performing-Options-Report-Kildare-Meath-Grid-Upgrade.pdf
EirGrid
EirGrid Group
Grid Development

Kildare-Meath Consultation Brochure Autumn 2020

  • Read more about Kildare-Meath Consultation Brochure Autumn 2020

Kildare-Meath Consultation Brochure Autumn 2020

Kildare-Meath-Consultation-Brochure-Autumn-2020.pdf