Joint TSO & TAO Electricity Transmission Performance Report 2017
Joint TSO/TAO Report setting out EirGrid and ESBN’s performance in developing, operating and maintaining the transmission system
Controllability Status Update - December 2018
Three level hierarchy classification for wind farms
Operational Constraints Update - January 2019
Monthly update of all-island system constraints
Contracted TSO Wind Farms as of 21 January 2019
Contracted TSO Wind Farms as of 21 January 2019
Transmission Outage Summary 2019 (Week 7-8)
Two week summary of transmission outages
Transmission Outage Summary 2019 (Week 5-6)
Two week summary of transmission outages
Transmission Outage Summary 2019 (Week 3-4)
Two week summary of transmission outages
Transmission Outage Summary 2019 (Week 1-2)
Two week summary of transmission outages
Operational Constraints Update
Monthly update of all island system constraints
Controllability Status Update - November 2018
Three-level hierarchy classification for wind farms