Compliance Testing Notification List - December 2018
Notification List update no. 16 for period - December 24th onwards
EirGrid Strategic Incentive Proposals 2019 Consultation Paper
Consultation paper setting out EirGrid’s proposed strategic incentive KPIs for 2019.
Operational Constraints Update
Monthly update of all island system constraints
2018 Qtr3 Wind Dispatch Down Report
2018 Qtr3 Wind Dispatch Down Report
Controllability Status Update - October 2018
Three level hierarchy classification for wind farms.
Transmission Outage Summary 2018 (Week 45-46)
Two-week summary of transmission outages
Transmission Outage Summary 2018 (Week 43-44)
Two week summary of transmission outages
Transmission Outage Summary 2018 (Week 47-48)
Transmission Outage Summary 2018 (Week 47-48)
Operational Constraints Update - 26.10.18
Monthly update of all island system constraints
Controllability Status Update
Three level hierarchy classification for Wind farms