Skip to main content

Breadcrumb

  1. Back to site
  2. Operations
  3. Edit Taxonomy term

Operations

Compliance Testing Notification List - December 2018

  • Read more about Compliance Testing Notification List - December 2018

Notification List update no. 16 for period - December 24th onwards

2018-12-10-Notification-List-for-Testing.pdf
EirGrid Group
Operations

EirGrid Strategic Incentive Proposals 2019 Consultation Paper

  • Read more about EirGrid Strategic Incentive Proposals 2019 Consultation Paper

Consultation paper setting out EirGrid’s proposed strategic incentive KPIs for 2019.

Consultation-on-Proposed-Strategic-Incentives-2019.pdf
DS3 Programme
EirGrid
Transmission
Operations

Operational Constraints Update

  • Read more about Operational Constraints Update

Monthly update of all island system constraints

OperationalConstraintsUpdateVersion1_76_Nov_2018.pdf
Constraints Update
Operations

2018 Qtr3 Wind Dispatch Down Report

  • Read more about 2018 Qtr3 Wind Dispatch Down Report

2018 Qtr3 Wind Dispatch Down Report

2018-Qtr3-Wind-Dispatch-Down-Report.pdf
Operations
EirGrid

Controllability Status Update - October 2018

  • Read more about Controllability Status Update - October 2018

Three level hierarchy classification for wind farms.

2018-10-October-Controllability-status-update.pdf
Operations
EirGrid Group

Transmission Outage Summary 2018 (Week 45-46)

  • Read more about Transmission Outage Summary 2018 (Week 45-46)

Two-week summary of transmission outages

Summary-TOP-Weeks-45-46-(2018.10.24).pdf
Operations
Transmission

Transmission Outage Summary 2018 (Week 43-44)

  • Read more about Transmission Outage Summary 2018 (Week 43-44)

Two week summary of transmission outages

Summary-TOP-Weeks-43-44-(2018.10.11).pdf
Operations
Transmission

Transmission Outage Summary 2018 (Week 47-48)

  • Read more about Transmission Outage Summary 2018 (Week 47-48)

Transmission Outage Summary 2018 (Week 47-48)

Summary-TOP-Weeks-47-48-(2018.11.07).pdf
EirGrid
Transmission
Operations

Operational Constraints Update - 26.10.18

  • Read more about Operational Constraints Update - 26.10.18

Monthly update of all island system constraints

OperationalConstraintsUpdateVersion1_75_Oct_2018.pdf
Constraints Update
EirGrid
Operations

Controllability Status Update

  • Read more about Controllability Status Update

Three level hierarchy classification for Wind farms

2018-09-September-Controllability-status-update.pdf
Operations

Pagination

  • Previous page
  • Current page 37
  • Next page
Subscribe to Operations