Skip to main content

Breadcrumb

  1. Back to site
  2. EirGrid Group
  3. Edit Taxonomy term

EirGrid Group

Outage Week 6(2019)-21(2019)

  • Read more about Outage Week 6(2019)-21(2019)

16 Week All-Island Generator Outage Plan

Outage-Week-6(2019)-21(2019).xlsx
EirGrid Group
Generation

Controllability Status Update - December 2018

  • Read more about Controllability Status Update - December 2018

Three level hierarchy classification for wind farms

Controllability-status-update-December-2018.pdf
Operations
EirGrid Group

Operational Constraints Update - January 2019

  • Read more about Operational Constraints Update - January 2019

Monthly update of all-island system constraints

OperationalConstraintsUpdateVersion1_78_Jan_2019.pdf
EirGrid Group
Constraints Update
Operations

Synchronous Area Operational Area for the Ireland and Northern Ireland Synchronous area V1.0

  • Read more about Synchronous Area Operational Area for the Ireland and Northern Ireland Synchronous area V1.0

Synchronous Area Operational Area for the Ireland and Northern Ireland Synchronous area V1.0

Synchronous-Area-Operational-Area-for-the-Ireland-and-Northern-Ireland-S....pdf
EirGrid Group

LFC Block Proposal Submission for Ireland and Northern Ireland V1.0

  • Read more about LFC Block Proposal Submission for Ireland and Northern Ireland V1.0

LFC Block Proposal Submission for Ireland and Northern Ireland V1.0

LFC-Block-Proposal-Submission-for-Ireland-and-Northern-Ireland-V1.0.pdf
EirGrid Group

Outage Week 5(2019)-20(2019)

  • Read more about Outage Week 5(2019)-20(2019)

16 Week All-Island Generator Outage Plan

Outage-Week-5(2019)-20(2019).xlsx
EirGrid Group
Generation

Signal List for Battery Units

  • Read more about Signal List for Battery Units

The Battery Signal List which include the signals required for the provision of System Services

Battery-Signal-List-System-Services-FFR.xlsx
System Services
EirGrid
DS3 Programme
EirGrid Group

Signal List for Interconnector Units

  • Read more about Signal List for Interconnector Units

The Interconnector Signal List which include the signals required for the provision of System Services

Interconnector-Signal-List-System-Services-FFR.xlsx
EirGrid
EirGrid Group
System Services
DS3 Programme

Other System Charges (OSC) Trip Report

  • Read more about Other System Charges (OSC) Trip Report

This report contains a monthly breakdown of the All Island Trip Charges for the 2018/2019 tariff year.

OSC-Trip-Information_Nov18.pdf
EirGrid Group
Generation

AS OSC Report Nov 2018

  • Read more about AS OSC Report Nov 2018

This report contains a monthly breakdown of the Ancillary Services & Other System Charges for the 2018/2019 tariff year.

ASOSC_Outturn-Report_Nov18.pdf
EirGrid Group
Generation

Pagination

  • Previous page
  • Current page 60
  • Next page
Subscribe to EirGrid Group