Skip to main content

Breadcrumb

  1. Back to site
  2. Grid Development
  3. View Publication Categories

Grid Development

CP1153 Oldstreet Tynagh Cashla AAS Determination

  • Read more about CP1153 Oldstreet Tynagh Cashla AAS Determination

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.

CP1153-Oldstreet-Tynagh-Cashla-AAS-Determ-EA-issue.pdf
Grid Development

CP1152 Arva protection Upgrade AAS Determination

  • Read more about CP1152 Arva protection Upgrade AAS Determination

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.

CP1152-Arva-protection-Upgrade_AAS-Determination_EA-issue.pdf
Grid Development

CP1149 Newbridge Cushaling 110kV line Stations Bay Conductors and Lead in Conductor Uprate

  • Read more about CP1149 Newbridge Cushaling 110kV line Stations Bay Conductors and Lead in Conductor Uprate

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.

CP1149-Newbridge-Cushaling-110kV-line-Stations-bay-conductors-and-lead-in-conductor-uprate_EA-issue.pdf
Grid Development

CP1114 Drybridge and Platin AAS Determination

  • Read more about CP1114 Drybridge and Platin AAS Determination

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.

CP1114_-Drybridge-and-Platin-AASS-Determ_Rev1.pdf
Grid Development

CP1032 Cashla 220kV Station Circuit Breaker Replacement AAS Determination

  • Read more about CP1032 Cashla 220kV Station Circuit Breaker Replacement AAS Determination

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.

CP1032-Cashla-220-kV-Station-Circuit-Breaker-Replacement_AAS-Determination_EA-issue.pdf
Grid Development

CP1031 Flagford 220kV Station Circuit Breaker Replacement AAS Determination

  • Read more about CP1031 Flagford 220kV Station Circuit Breaker Replacement AAS Determination

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.

CP1031-Flagford-220-kV-Station-Circuit-Breaker-Replacement_AAS-Determination_EA-issue.pdf
Grid Development

Transmission Development Plan 2020-2029 Consultation Report

  • Read more about Transmission Development Plan 2020-2029 Consultation Report

The Consultation Report describes the TDP consultation
process. It also provides an overview of the submissions
received and our responses to the issues raised.

Transmission-Development-Plan-2020-2029-Consultation-Report.pdf
Development Plan
Transmission
Grid Development

Transmission Development Plan 2020-2029 Environmental Appraisal Report

  • Read more about Transmission Development Plan 2020-2029 Environmental Appraisal Report

The EAR has been prepared to ensure that the TDP is in
accordance with the provisions of the adopted Grid
Implementation Plan 2017-2022 and associated Strategic
Environmental Assessment.

Transmission-Development-Plan-2020-2029-Environmental-Appraisal-Report.pdf
Transmission
Development Plan
Environment
Grid Development

Transmission Development Plan 2020-2029

  • Read more about Transmission Development Plan 2020-2029

The Transmission Development Plan is a statuary document which
reports specific projects over the next ten years

Transmission-Development-Plan-2020-2029.pdf
Transmission
Development Plan
Grid Development
TSO Regulatory Publications
2020

CP0816 Proposed Site Investigation Works – Flagford-Tonroe 110 kV Line (County Roscommon)

  • Read more about CP0816 Proposed Site Investigation Works – Flagford-Tonroe 110 kV Line (County Roscommon)

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is likely to
significantly affect European sites designated by the EU
Habitats Directive.

CP0816-Tonroe-to-Flagford-SI_-AAS-Determination_PA-issue.pdf
Environment
Grid Development

Pagination

  • Previous page
  • Current page 21
  • Next page
Subscribe to Grid Development