Skip to main content

Breadcrumb

  1. Back to site
  2. Grid Development
  3. View Publication Categories

Grid Development

CP1021- Finglas 400 kV Connection Substation Feasibility Report

  • Read more about CP1021- Finglas 400 kV Connection Substation Feasibility Report

Substation Feasibility Assessment - Finglas 400 kV Connection.

321084AJ-REP-006-Finglas-400-kV-Connection-Substation-Feasibility-Report-Final-April-2022.pdf
Grid Development

CP1021 Environmental Constraints Report

  • Read more about CP1021 Environmental Constraints Report

This Environmental Constraints Report has been prepared to
identify the environmental constraints that should
be considered for the proposed project.

321084AJ-REP-004-Environmental-Constraints-Report-Final-May-2022.pdf
Grid Development

Capital Project 1021 - OHL Feasibility Report

  • Read more about Capital Project 1021 - OHL Feasibility Report

This report only considers the technical feasibility of the
Overhead Line (OHL) options.

321084AJ-REP-003-OHL-Feasibility-Report-Final-April-2022.pdf
Grid Development

CP1021 Proposed Project Overview Report

  • Read more about CP1021 Proposed Project Overview Report

Capital Project 1021 (CP1021) is a proposed project to
reinforce the electricity network between East Meath and
North Dublin.

321084AJ-REP-001-Project-Overview-Report-Final-April-2022.pdf
Grid Development

Celtic Interconnector Community Forum - minute

  • Read more about Celtic Interconnector Community Forum - minute

Date: 8 November 2021

Celtic-Forum-Meeting-minutes-8th-Nov-2021.pdf
Grid Development
Celtic Interconnector

Kildare-Meath Grid Upgrade 4A Report

  • Read more about Kildare-Meath Grid Upgrade 4A Report

This Step 4A Report presents an analysis of the proposed route
options. It describes the process followed to identify and
evaluate the proposed route options.

KMGU-JAC-TN-0017-Step-4A-Report-08-03-2022-Compressed.pdf
Grid Development

Kildare-Meath Grid Upgrade 4A Report

  • Read more about Kildare-Meath Grid Upgrade 4A Report

This Step 4A Report presents an analysis of the proposed route
options.

KMGU-JAC-TN-0017-Step-4A-Report-07-03-2022-Compressed.pdf
Grid Development

Kildare-Meath Grid Upgrade, Step 4 - Consultation Summary Report

  • Read more about Kildare-Meath Grid Upgrade, Step 4 - Consultation Summary Report

This report provides a summary of responses received to the
Step 4 Consultation on the proposed Kildare-Meath Grid
Upgrade, undertaken by EirGrid between 31 August and 22
November 2021.

11318_KildareMeathGridUpgradeStep4_Consultation_FINAL.pdf
Grid Development

Kildare-Meath Grid Upgrade Brochure

  • Read more about Kildare-Meath Grid Upgrade Brochure

The Kildare-Meath Grid Upgrade will add a high-capacity,
underground electricity connection between Dunstown substation
in County Kildare and Woodland substation in County Meath.

209452-EirGrid-Kildare-Meath-Grid-Upgrade-March-7-2022-Final.pdf
Grid Development

Annual Electricity Transmission Performance Report 2020

  • Read more about Annual Electricity Transmission Performance Report 2020

This report seeks to provide customers, industry and stakeholders with clear and accessible
reporting on our operation, development and maintenance of the transmission system.

Annual-Electricity-Transmission-Performance-Report-2020.pdf
TSO Regulatory Publications
2020
Transmission
Operations
Grid Development

Pagination

  • Previous page
  • Current page 21
  • Next page
Subscribe to Grid Development