CP1021- Finglas 400 kV Connection Substation Feasibility Report
Substation Feasibility Assessment - Finglas 400 kV Connection.
CP1021 Environmental Constraints Report
This Environmental Constraints Report has been prepared to
identify the environmental constraints that should
be considered for the proposed project.
Capital Project 1021 - OHL Feasibility Report
This report only considers the technical feasibility of the
Overhead Line (OHL) options.
CP1021 Proposed Project Overview Report
Capital Project 1021 (CP1021) is a proposed project to
reinforce the electricity network between East Meath and
North Dublin.
Kildare-Meath Grid Upgrade 4A Report
This Step 4A Report presents an analysis of the proposed route
options. It describes the process followed to identify and
evaluate the proposed route options.
Kildare-Meath Grid Upgrade 4A Report
This Step 4A Report presents an analysis of the proposed route
options.
Kildare-Meath Grid Upgrade, Step 4 - Consultation Summary Report
This report provides a summary of responses received to the
Step 4 Consultation on the proposed Kildare-Meath Grid
Upgrade, undertaken by EirGrid between 31 August and 22
November 2021.
Kildare-Meath Grid Upgrade Brochure
The Kildare-Meath Grid Upgrade will add a high-capacity,
underground electricity connection between Dunstown substation
in County Kildare and Woodland substation in County Meath.
Annual Electricity Transmission Performance Report 2020
This report seeks to provide customers, industry and stakeholders with clear and accessible
reporting on our operation, development and maintenance of the transmission system.