Joint TSO & TAO Electricity Transmission Performance Report 2017
Joint TSO/TAO Report setting out EirGrid and ESBN’s performance in developing, operating and maintaining the transmission system
201553-Eirgrid-TSO-and-TAO-Report_LR5.pdf
Project Brochure - Intel Project
Brochure for the Intel Project - CP1029
201715-EirGrid-CP1029-Project-Report_Web.pdf
General Environmental Constraints Map - Intel Project
Map showing the general environmental constraints - Intel Project
General-Environmental-Constraints-Map-Intel-Project.pdf
Substation Locations - Options 1, 2 and 3 - Intel Project
Map showing all possible substation locations - Intel Project
Substation-location-options-1-2-and-3-Intel-Project.pdf
Substation Location Option 3 - Intel Project
Map showing option 3 for proposed substation - Intel Project
Substation-location-option-3-Intel-Project.pdf
Substation Location Option 2 - Intel Project
Map showing option 2 for proposed substation - Intel Project
Substation-location-option-2-Intel-Project.pdf
Substation Location Option 1 - Intel Project
Map showing option 1 for proposed substation - Intel Project
Substation-location-option-1-Intel-Project.pdf
Study Area Map - Intel Project
Map showing the study area for Intel Project CP1029
Study-Area-Intel-Project.pdf
TES 2017 System Needs Assessment Summary Booklet - Final
TES 2017 System Needs Assessment summary booklet - Final
TES-2017-System-Needs-Assessment-summary-booklet-final.pdf
TES 2017 System Needs Assessment - Final
TES 2017 System Needs Assessment - Final
TES-2017-System-Needs-Assessment-Final.pdf