Outage Week 30(2017)-45(2017)
Outage Week 30(2017)-45(2017)
GLDPM-v1
Common Grid Model Methodology (CGMM) - as required under Article 9(6) of CACM.
CGMM-v1-plus
Generation and Load Data Provision Methodology (GLDPM) – as required under Article 16 of CACM.
RfG Banding Thresholds Consultation Minded-To Position Ireland
RfG Banding Thresholds Consultation Minded-To Position Ireland
Operational Constraints Update
Monthly update of all island system constraints
Outage Week 29(2017)-44(2017)
Outage Week 29(2017)-44(2017)
All Island Transmission System Performance Report
Detailed report on the performance of the transmission system in Ireland and Northern Ireland
Transmission Outage Summary 2017 (Week 27-28)
Transmission Outage Summary 2017 (Week 27-28)
2017 Transmission Outage Programme
2017 Transmission Outage Programme