Temporary Access Routes
Temporary Access Routes
Temporary-Access-Routes.pdf
Modified Access Routes April 2016
Modified Access Routes April 2016
Modified-Access-Routes-April-2016.PDF
Modified Access Routes May 2016 Tower 146 LCT 086
Modified Access Routes May 2016 Tower 146 LCT 086
Modified-Access-Routes-May-2016-Tower-146-LCT-086.PDF
Modified Access Routes May 2016 Tower 189 and Stringing for Tower 188 - LCT 159 & LCT 161
Modified Access Routes, May 2016, Tower 189, Stringing for Tower 188, LCT 159, LCT 161
Modified-Access-Routes-May-2016-Tower-189-and-Stringing-for-Tower-188-LCT-159-LCT-161.PDF
Module 1.8 Construction Modified Access Routes
Module 1.8 Construction Modified Access Routes
Module-1.8-Construction-(to-include-temporary-access-routes)-Modified-Access-Routes.PDF
Overview of North-South 400kV Interconnection Development including Appendix Alternative Temporary Access Routes
Overview of North-South 400kV Interconnection Development including Appendix Alternative Temporary Access Routes
Overview-of-North-South-400kV-Interconnection-Development-including-Appendix-Alternative-Temporary-Access-Routes.PDF
Transmission System Security and Planning Standards
The Transmission System Security and Planning Standards outlines the criteria for planning the transmission system.
EirGrid-Transmission-System-Security-and-Planning-Standards-TSSPS-Final-May-2016-APPROVED.pdf
Outage Weeks 19(2016)-35(2016)
Outage Weeks 19(2016)-35(2016)
Outage-Weeks-19(2016)-35(2016).xlsx
Outage Weeks 18(2016)-34(2016)
Outage Weeks 18(2016)-34(2016)
Outage-Weeks-18(2016)-34(2016).xlsx
Transmission Outage Summary 2016 (Week 19-20)
Transmission Outage Summary 2016 (Week 19-20)
Transmission-Outage-Weeks-19-20.pdf