Ecology Guidelines for Electricity Transmission Projects
A standard approach to ecological impact assessment of high
voltage transmission projects
Pre Network Code Derogation Application Form – Non Windfarm PPM Plant/System
GC9-1 Non Network Codes Plant, BESS or SCU Derogation Application Form
EirGrid TSO Annual Compliance Report 2019
Annual report specifying the measures taken and the level of compliance to ensure that discriminatory conduct by it or its employees is prevented
EirGrid TSO Annual Compliance Report 2018
TSO Annual Compliance Report 2018
Annual Protected Disclosures Report 2019/2020
Annual Protected Disclosures Report 2019/2020
Operational Constraints Update – November 2020
Monthly update of all island system constraints
Celtic Interconnector - Step 4 Overview
Celtic Interconnector - Step 4 Overview
Celtic Interconnector - Step 4b Brochure (Winter 2020)
Celtic Interconnector - Step 4b Brochure (Winter 2020)
WFPS OR Test Procedure Template
Test Procedure Template for WFPS wishing to apply for a DS3
System Services Operating Reserve Contract