Station Auxiliary Power Supplies Functional Specification
Technical specification covering the technical
requirements of the design, supply at site and
installation of substation auxiliary power supplies
Control, Protection and Metering Functional Specification
Technical specification covering the technical
requirements of the design, supply at site, installation
and testing of substation control, protection and metering
equipment.
Proposed Celtic Interconnector Cable Route - February 2021
Proposed Celtic Interconnector Cable Route - February 2021
Approved Uninstructed Imbalance Parameters 2021
The TSOs have a regulatory requirement to publish the
approved Uninstructed Imbalance Parameters according to
the Trading & Settlement code
Guideline for the Application of Connection Network Codes to Existing Users- V1.0.pdf
Guideline for the Application of Connection Network Codes
to Existing Users- V1.0.pdf
CP1121 Aghada Power Station [Exempted Development]
The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is
likely to significantly affect European sites designated
by the EU Habitats Directive.
Replacement of Tower 92 on the Gorman-Louth 220 kV Circuit [Exempted Development]
The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is
likely to significantly affect European sites designated
by the EU Habitats Directive.
CP1126 – Tievebrack Substation [Exempted Development]
The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is
likely to significantly affect European sites designated
by the EU Habitats Directive.
Quarterly Imperfections Cost Report Q1 Oct Dec FY2021
Quarterly update of factors affecting imperfections costs
ECP-2.1 Update - January 2021
Update on ECP-2.1 initial batch November 2020