Skip to main content

Breadcrumb

  1. Back to site
  2. EirGrid
  3. View Publication Categories

EirGrid

Station Auxiliary Power Supplies Functional Specification

  • Read more about Station Auxiliary Power Supplies Functional Specification

Technical specification covering the technical
requirements of the design, supply at site and
installation of substation auxiliary power supplies

Station-Auxiliary-Power-Supplies-Functional-Specification.pdf
EirGrid
Customer Information

Control, Protection and Metering Functional Specification

  • Read more about Control, Protection and Metering Functional Specification

Technical specification covering the technical
requirements of the design, supply at site, installation
and testing of substation control, protection and metering
equipment.

Control-Protection-and-Metering-Functional-Specification.pdf
EirGrid
Customer Information

Proposed Celtic Interconnector Cable Route - February 2021

  • Read more about Proposed Celtic Interconnector Cable Route - February 2021

Proposed Celtic Interconnector Cable Route - February 2021

EirGrid-Proposed-Celtic-Interconnector-Cable-Route-Map.pdf
EirGrid
Grid Development
Celtic Interconnector

Approved Uninstructed Imbalance Parameters 2021

  • Read more about Approved Uninstructed Imbalance Parameters 2021

The TSOs have a regulatory requirement to publish the
approved Uninstructed Imbalance Parameters according to
the Trading & Settlement code

Approved-Uninstructed-Imbalance-Parameters-2021.pdf
EirGrid

Guideline for the Application of Connection Network Codes to Existing Users- V1.0.pdf

  • Read more about Guideline for the Application of Connection Network Codes to Existing Users- V1.0.pdf

Guideline for the Application of Connection Network Codes
to Existing Users- V1.0.pdf

Guideline-for-the-Application-of-Connection-Network-Codes-to-Existing-Users-V1.0.pdf
EirGrid
Grid Code

CP1121 Aghada Power Station [Exempted Development]

  • Read more about CP1121 Aghada Power Station [Exempted Development]

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is
likely to significantly affect European sites designated
by the EU Habitats Directive.

CP1121-Aghada-Power-Station-[Exempted-Development].pdf
Grid Development
EirGrid

Replacement of Tower 92 on the Gorman-Louth 220 kV Circuit [Exempted Development]

  • Read more about Replacement of Tower 92 on the Gorman-Louth 220 kV Circuit [Exempted Development]

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is
likely to significantly affect European sites designated
by the EU Habitats Directive.

Replacement-of-Tower-92-on-the-Gorman-Louth-220-kV-Circuit-[Exempted-Development].pdf
EirGrid
Grid Development

CP1126 – Tievebrack Substation [Exempted Development]

  • Read more about CP1126 – Tievebrack Substation [Exempted Development]

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is
likely to significantly affect European sites designated
by the EU Habitats Directive.

CP1126-Tievebrack-Substation-[Exempted-Development].pdf
EirGrid
Grid Development

Quarterly Imperfections Cost Report Q1 Oct Dec FY2021

  • Read more about Quarterly Imperfections Cost Report Q1 Oct Dec FY2021

Quarterly update of factors affecting imperfections costs

Quarterly-Imperfections-Cost-Report-Q1-Oct-Dec-FY2021.pdf
EirGrid

ECP-2.1 Update - January 2021

  • Read more about ECP-2.1 Update - January 2021

Update on ECP-2.1 initial batch November 2020

2020-Batch-(ECP-2.1)-Results-Joint-SO-Publication_January-2021.pdf
EirGrid
Customer Information

Pagination

  • Previous page
  • Current page 27
  • Next page
Subscribe to EirGrid