Skip to main content

Breadcrumb

  1. Back to site
  2. EirGrid
  3. Edit Taxonomy term

EirGrid

Approved Uninstructed Imbalance Parameters 2021

  • Read more about Approved Uninstructed Imbalance Parameters 2021

The TSOs have a regulatory requirement to publish the
approved Uninstructed Imbalance Parameters according to
the Trading & Settlement code

Approved-Uninstructed-Imbalance-Parameters-2021.pdf
EirGrid

Guideline for the Application of Connection Network Codes to Existing Users- V1.0.pdf

  • Read more about Guideline for the Application of Connection Network Codes to Existing Users- V1.0.pdf

Guideline for the Application of Connection Network Codes
to Existing Users- V1.0.pdf

Guideline-for-the-Application-of-Connection-Network-Codes-to-Existing-Users-V1.0.pdf
EirGrid
Grid Code

CP1121 Aghada Power Station [Exempted Development]

  • Read more about CP1121 Aghada Power Station [Exempted Development]

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is
likely to significantly affect European sites designated
by the EU Habitats Directive.

CP1121-Aghada-Power-Station-[Exempted-Development].pdf
Grid Development
EirGrid

Replacement of Tower 92 on the Gorman-Louth 220 kV Circuit [Exempted Development]

  • Read more about Replacement of Tower 92 on the Gorman-Louth 220 kV Circuit [Exempted Development]

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is
likely to significantly affect European sites designated
by the EU Habitats Directive.

Replacement-of-Tower-92-on-the-Gorman-Louth-220-kV-Circuit-[Exempted-Development].pdf
EirGrid
Grid Development

CP1126 – Tievebrack Substation [Exempted Development]

  • Read more about CP1126 – Tievebrack Substation [Exempted Development]

The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is
likely to significantly affect European sites designated
by the EU Habitats Directive.

CP1126-Tievebrack-Substation-[Exempted-Development].pdf
EirGrid
Grid Development

Quarterly Imperfections Cost Report Q1 Oct Dec FY2021

  • Read more about Quarterly Imperfections Cost Report Q1 Oct Dec FY2021

Quarterly update of factors affecting imperfections costs

Quarterly-Imperfections-Cost-Report-Q1-Oct-Dec-FY2021.pdf
EirGrid

ECP-2.1 Update - January 2021

  • Read more about ECP-2.1 Update - January 2021

Update on ECP-2.1 initial batch November 2020

2020-Batch-(ECP-2.1)-Results-Joint-SO-Publication_January-2021.pdf
EirGrid
Customer Information

Q4 2020 ATR Status Update - published 29 January 21

  • Read more about Q4 2020 ATR Status Update - published 29 January 21

This document allows generators to track the status of the
Associated Transmission Reinforcements (ATRs) associated
with their generation project(s).

2020-Q4-ATR-Status-Update.pdf
EirGrid
Operations

Operational Constraints Update – January 2021

  • Read more about Operational Constraints Update – January 2021

Monthly update of all island system constraints

OperationalConstraintsUpdateVersion1_102_January_2021.pdf
Constraints Update
EirGrid

Engagement process for development and update of technical standards and policies

  • Read more about Engagement process for development and update of technical standards and policies

Engagement process for development and update of technical
standards and policies

Engagement-process-for-development-and-update-of-technical-standards-and-policies..pdf
Customer Information
EirGrid

Pagination

  • Previous page
  • Current page 26
  • Next page
Subscribe to EirGrid