Skip to main content

Breadcrumb

  1. Back to site
  2. EirGrid
  3. View Publication Categories

EirGrid

Celtic Interconnector: Route Options Review In the Vicinity of Churchtown

  • Read more about Celtic Interconnector: Route Options Review In the Vicinity of Churchtown

Celtic Interconnector: Route Options Review In the
Vicinity of Churchtown

Churchtown-Route-MCA-March-2021.pdf
EirGrid
Celtic Interconnector
Grid Development

Other System Charges (OSC) Consultation 2021-2022

  • Read more about Other System Charges (OSC) Consultation 2021-2022

Annual OSC Consultation

Other-System-Charges-(OSC)-Consultation-2021-2022.pdf
Operations
Constraints Update
EirGrid

Contracted TSO (Non Wind) Generators

  • Read more about Contracted TSO (Non Wind) Generators

Contracted TSO (Non Wind) Generators

TSO_NonWind_Contracted.pdf
EirGrid
Generation

Contracted TSO Wind Farms as of 16 March 2021

  • Read more about Contracted TSO Wind Farms as of 16 March 2021

Contracted TSO Wind Farms

TSO_Wind_Contracted.pdf
EirGrid
Generation

Flexible Demand Operating Protocol

  • Read more about Flexible Demand Operating Protocol

This protocol sets out the operational arrangements in
place between the System Operator and the customer for
implementation of Flexible Demand at the customer’s
site(s).

Flexible-Demand-Operating-Protocol.pdf
Customer Information
EirGrid

DSU Test Procedure – Capacity Test – 6 Hours

  • Read more about DSU Test Procedure – Capacity Test – 6 Hours

DSU Test Procedure – Capacity Test – 6 Hours

DSU-Test-Procedure-Aggregate-MW-Capacity-Test-6-Hours.docx
EirGrid
Customer Information

FOI Disclosure Log - EirGrid

  • Read more about FOI Disclosure Log - EirGrid

FOI Disclosure Log - EirGrid

FOI-Disclosure-Log.xlsx
EirGrid
FOI
Other

Form GEN04 - Generator Outage Detail Form V2.1

  • Read more about Form GEN04 - Generator Outage Detail Form V2.1

Form GEN04 - Generator Outage Detail Form

Form-GEN04-Generator-Outage-Detail-Form-V2.1.docx
Customer Information
EirGrid
Operations

North Connacht Project Step 4B - Appendix E - EBPO Mapping

  • Read more about North Connacht Project Step 4B - Appendix E - EBPO Mapping

North Connacht Project Step 4B - Appendix E - EBPO Mapping

North-Connacht-Project-Step-4B-Appendix-E-EBPO-Mapping.pdf
Grid Development
EirGrid

North Connacht Project Step 4A - Appendix-C

  • Read more about North Connacht Project Step 4A - Appendix-C

North Connacht Project Step 4A - Appendix-C

North-Connacht-Project-Step-4A-Appendix-C.pdf
Grid Development
EirGrid

Pagination

  • Previous page
  • Current page 25
  • Next page
Subscribe to EirGrid