Flexible Demand Operating Protocol
This protocol sets out the operational arrangements in
place between the System Operator and the customer for
implementation of Flexible Demand at the customer’s
site(s).
Flexible-Demand-Operating-Protocol.pdf
DSU Test Procedure – Capacity Test – 6 Hours
DSU Test Procedure – Capacity Test – 6 Hours
DSU-Test-Procedure-Aggregate-MW-Capacity-Test-6-Hours.docx
FOI Disclosure Log - EirGrid
FOI Disclosure Log - EirGrid
FOI-Disclosure-Log.xlsx
Form GEN04 - Generator Outage Detail Form V2.1
Form GEN04 - Generator Outage Detail Form
Form-GEN04-Generator-Outage-Detail-Form-V2.1.docx
North Connacht Project Step 4B - Appendix E - EBPO Mapping
North Connacht Project Step 4B - Appendix E - EBPO Mapping
North-Connacht-Project-Step-4B-Appendix-E-EBPO-Mapping.pdf
North Connacht Project Step 4A - Appendix-C
North Connacht Project Step 4A - Appendix-C
North-Connacht-Project-Step-4A-Appendix-C.pdf
North Connacht Project Step 4B - Appendix A
North Connacht Project Step 4B - Appendix A
North-Connacht-Project-Step-4B-Appendix-A.zip
North Connacht: Step 4B Development Option and Evaluation Report
North Connacht: Step 4B Development Option and Evaluation
Report
Step-4B-Development-Option-and-Evaluation-Report_FINAL.pdf
North Connacht project: Emerging Best Performing Option - Underground Corridor Option 2
North Connacht project: Emerging Best Performing Option -
Underground Corridor Option 2
20210309_EBPO_InsertMap_Discovery-(2)-_image-1.jpg
CP0091 Proposed Line Alteration: Conflict (LC0103) with Athy-Carlow 110 kV Line (County Carlow)
CP0091 Proposed Line Alteration: Conflict (LC0103) with
Athy-Carlow 110 kV Line (County Carlow)
CP00096-LC0103-Athy-Carlow-AAS-Determination_Draft.pdf