Stakeholder Engagement Plan 2021
This document summarises EirGrid’s plans for stakeholder
engagement from 2021 onwards
North Connacht Project - Step 4 Consultation Report
North Connacht Project - Step 4 Consultation Report
North Connacht Project Update Document - Spring 2021
North Connacht Project Update Document - Spring 2021
110 kV AIS Substation Layout Drawings – 8 Bay (XDN-LAY-ELEV-STND-H-001-R08)
Design standard drawings showing layout of 110 kV AIS 8-
bay substation
Station Auxiliary Power Supplies Functional Specification
Technical specification covering the technical
requirements of the design, supply at site and
installation of substation auxiliary power supplies
Control, Protection and Metering Functional Specification
Technical specification covering the technical
requirements of the design, supply at site, installation
and testing of substation control, protection and metering
equipment.
Proposed Celtic Interconnector Cable Route - February 2021
Proposed Celtic Interconnector Cable Route - February 2021
Approved Uninstructed Imbalance Parameters 2021
The TSOs have a regulatory requirement to publish the
approved Uninstructed Imbalance Parameters according to
the Trading & Settlement code
Guideline for the Application of Connection Network Codes to Existing Users- V1.0.pdf
Guideline for the Application of Connection Network Codes
to Existing Users- V1.0.pdf
CP1121 Aghada Power Station [Exempted Development]
The document sets out EirGrid’s Appropriate Assessment
Screening determination as to whether the project is
likely to significantly affect European sites designated
by the EU Habitats Directive.