Celtic Interconnector Project – Letter from Competent Authority to EirGrid Approving Concept for Public Participation
Celtic Interconnector Project – Letter from Competent Authority to
EirGrid Approving Concept for Public Participation
Wind Forecast Accuracy Report June 2020
Wind Forecast Accuracy Report
System Services Report Checklist
This Checklist is to be submitted with each System Services report
to ensure all required aspects of a complete report are met.
System Services Scope Document
The System Services Scope Document is submitted by the tendering
unit and outlines the services the unit wishes to contract for.
DS3 System Services Locational Scalars Consultation
A request from CRU directed EirGrid to develop a consultation
paper on Implementation of Locational Scalars for system
services provided in the Dublin region. This paper outlines
the proposals associated with the implementation of Locational
Scalars
EirGrid Stakeholder Engagement Plan 2020 Consultation Response Paper
Consultation Response Paper V2.0
EirGrid Stakeholder Engagement Report 2019 Consultation Response Paper
Consultation Response Paper V2.0
EirGrid Innovation Projects 2018
This reports sets out the innovation projects that EirGrid
undertook in 2018
RfG_Signal List Template TSO Wind Type D
RfG_Signal List Template TSO Wind Type D
RfG_Signal List Template DSO Wind Topology 2
RfG_Signal List Template DSO Wind Topology 2