Minimum Load Generation Test Procedure Template
Minimum Load Generation Test Procedure Template
Stakeholder Engagement Plan 2020
This document highlights our completed engagement over the
current calendar year including our approach and scheduled
engagement for the rest of 2020
Demonstration of Start-Up Times Test Procedure Template
Demonstration of Start-Up Times Test Procedure Template
Declaration of Fitness Test Procedure Template
Declaration of Fitness Test Procedure Template
Block Load Test Procedure Template
Block Load Test Procedure Template
Automatic Generator Control Test Procedure Template
Automatic Generator Control Test Procedure Template
Alerts Test Procedure Template
Alerts Test Procedure Template
EirGrid Price Review 5 Submission
This document aims to provide electricity consumers and
industry stakeholders with information as to EirGrid’s
planned outputs as part of PR5. As part of this publication, we
have included a range of output metrics we are targeting for
delivery during PR5. This aims to ensure full transparency
with regard to EirGrid’s performance throughout the PR5
period.
EirGrid PR5 submission - executive summary
EirGrid PR5 submission - executive summary
Celtic Interconnector – Preliminary Acoustic Study Report
Celtic Interconnector – Preliminary Acoustic Study Report