General Environmental Constraints Map - Intel Project
Map showing the general environmental constraints - Intel Project
Substation Locations - Options 1, 2 and 3 - Intel Project
Map showing all possible substation locations - Intel Project
Substation Location Option 3 - Intel Project
Map showing option 3 for proposed substation - Intel Project
Substation Location Option 2 - Intel Project
Map showing option 2 for proposed substation - Intel Project
Substation Location Option 1 - Intel Project
Map showing option 1 for proposed substation - Intel Project
Study Area Map - Intel Project
Map showing the study area for Intel Project CP1029
Contracted TSO Wind Farms as of 21 January 2019
Contracted TSO Wind Farms as of 21 January 2019
Contracted TSO (Non Wind) Generators as of 21 January 2019
Contracted TSO (Non Wind) Generators as of 21 January 2019
Transmission Outage Summary 2019 (Week 7-8)
Two week summary of transmission outages
Transmission Outage Summary 2019 (Week 5-6)
Two week summary of transmission outages