Key Organisational Requirements, Roles and Responsibilities - 01 Oct 2018
Key Organisational Requirements, Roles and Responsibilities - 01 Oct 2018
KORRR-01-Oct-2018.pdf
KORRR SGU Consultation – Ireland
KORRR SGU Consultation – Ireland
190125_SGU-KORRR-Consultation_Ireland_V1.0.pdf
Project Brochure - Intel Project
Brochure for the Intel Project - CP1029
201715-EirGrid-CP1029-Project-Report_Web.pdf
General Environmental Constraints Map - Intel Project
Map showing the general environmental constraints - Intel Project
General-Environmental-Constraints-Map-Intel-Project.pdf
Substation Locations - Options 1, 2 and 3 - Intel Project
Map showing all possible substation locations - Intel Project
Substation-location-options-1-2-and-3-Intel-Project.pdf
Substation Location Option 3 - Intel Project
Map showing option 3 for proposed substation - Intel Project
Substation-location-option-3-Intel-Project.pdf
Substation Location Option 2 - Intel Project
Map showing option 2 for proposed substation - Intel Project
Substation-location-option-2-Intel-Project.pdf
Substation Location Option 1 - Intel Project
Map showing option 1 for proposed substation - Intel Project
Substation-location-option-1-Intel-Project.pdf
Study Area Map - Intel Project
Map showing the study area for Intel Project CP1029
Study-Area-Intel-Project.pdf
Contracted TSO Wind Farms as of 21 January 2019
Contracted TSO Wind Farms as of 21 January 2019
TSO_Wind_Contracted_18.01.2019.pdf