Skip to main content

Breadcrumb

  1. Back to site
  2. EirGrid
  3. View Publication Categories

EirGrid

Contracted TSO (Non Wind) Generators as of 21 January 2019

  • Read more about Contracted TSO (Non Wind) Generators as of 21 January 2019

Contracted TSO (Non Wind) Generators as of 21 January 2019

TSO_NonWind_Contracted_18.01.2019v2.pdf
EirGrid
Customer Information

Transmission Outage Summary 2019 (Week 7-8)

  • Read more about Transmission Outage Summary 2019 (Week 7-8)

Two week summary of transmission outages

Transmission-Outage-Summary-2019-(Weeks-7-8).pdf
Transmission
EirGrid
Operations

Transmission Outage Summary 2019 (Week 5-6)

  • Read more about Transmission Outage Summary 2019 (Week 5-6)

Two week summary of transmission outages

Transmission-Outage-Summary-2019-(Weeks-5-6).pdf
Operations
EirGrid
Transmission

Transmission Outage Summary 2019 (Week 3-4)

  • Read more about Transmission Outage Summary 2019 (Week 3-4)

Two week summary of transmission outages

Transmission-Outage-Summary-2019-(Weeks-3-4).pdf
EirGrid
Operations
Transmission

Procurement category figures over €20,000 – October to December 2018

  • Read more about Procurement category figures over €20,000 – October to December 2018

A list of purchase orders over €20,000 between October and December 2018

List-of-purchase-orders-over-20-000-2019-Q1.pdf
FOI
EirGrid
Other

Outage Week 4(2019)-19(2019)

  • Read more about Outage Week 4(2019)-19(2019)

16 Week All-Island Generator Outage Plan

Outage-Week-4(2019)-19(2019).xlsx
Generation
EirGrid

Statement of Charges 18-19 FAQ

  • Read more about Statement of Charges 18-19 FAQ

Statement of Charges 2018/19 Frequently Asked Questions v1.0

Statement-of-Charges-18-19-FAQ-v1.0.pdf
TSO Regulatory Publications
2018
EirGrid

Signal List for Battery Units

  • Read more about Signal List for Battery Units

The Battery Signal List which include the signals required for the provision of System Services

Battery-Signal-List-System-Services-FFR.xlsx
System Services
EirGrid
DS3 Programme
EirGrid Group

Signal List for Interconnector Units

  • Read more about Signal List for Interconnector Units

The Interconnector Signal List which include the signals required for the provision of System Services

Interconnector-Signal-List-System-Services-FFR.xlsx
EirGrid
EirGrid Group
System Services
DS3 Programme

Controllability Status Update - November 2018

  • Read more about Controllability Status Update - November 2018

Three-level hierarchy classification for wind farms

2018-11-November-Controllability-status-update.pdf
EirGrid
Operations

Pagination

  • Previous page
  • Current page 66
  • Next page
Subscribe to EirGrid