Skip to main content

Breadcrumb

  1. Back to site
  2. EirGrid
  3. View Publication Categories

EirGrid

Signal List for Battery Units

  • Read more about Signal List for Battery Units

The Battery Signal List which include the signals required for the provision of System Services

Battery-Signal-List-System-Services-FFR.xlsx
System Services
EirGrid
DS3 Programme
EirGrid Group

Signal List for Interconnector Units

  • Read more about Signal List for Interconnector Units

The Interconnector Signal List which include the signals required for the provision of System Services

Interconnector-Signal-List-System-Services-FFR.xlsx
EirGrid
EirGrid Group
System Services
DS3 Programme

Controllability Status Update - November 2018

  • Read more about Controllability Status Update - November 2018

Three-level hierarchy classification for wind farms

2018-11-November-Controllability-status-update.pdf
EirGrid
Operations

FOI Disclosure Log October 2015 to December 2018

  • Read more about FOI Disclosure Log October 2015 to December 2018

FOI Disclosure Log October 2015 to December 2018

FOI-Disclosure-Log-October-2015-to-December-2018.pdf
EirGrid
FOI
Other

Contracted TSO (Non Wind) Generators as of 14 December 2018

  • Read more about Contracted TSO (Non Wind) Generators as of 14 December 2018

Contracted TSO (Non Wind) Generators as of 14 December 2018

TSO_NonWind_Contracted_14.12.2018.pdf
EirGrid
Customer Information

Contracted TSO Wind Farms as of 14 December 2018

  • Read more about Contracted TSO Wind Farms as of 14 December 2018

Contracted TSO Wind Farms as of 14 December 2018

TSO_Wind_Contracted_14.12.2018.pdf
Customer Information
EirGrid

Summary Document: Pilot Community Fund evaluation

  • Read more about Summary Document: Pilot Community Fund evaluation

Plain English Summary of the evaluation on the Pilot Community Fund on the Mullingar-Kinnegad 110kV project.

Plain-English-Summary-of-Pilot-Evaluation.docx
EirGrid
Mullingar Reinforcement

EirGrid Pilot Community Fund - Evaluation Report

  • Read more about EirGrid Pilot Community Fund - Evaluation Report

Evaluation report of the EirGrid Pilot Community Fund in conjunction with the Mullingar-Kinnegad 110kV Project.

EirGrid-Community-Fund-Evaluation-Report_July-11-2017.pdf
Mullingar Reinforcement
EirGrid

EirGrid Strategic Incentive Proposals 2019 Consultation Paper

  • Read more about EirGrid Strategic Incentive Proposals 2019 Consultation Paper

Consultation paper setting out EirGrid’s proposed strategic incentive KPIs for 2019.

Consultation-on-Proposed-Strategic-Incentives-2019.pdf
DS3 Programme
EirGrid
Transmission
Operations

TES 2017 System Needs Assessment Summary Booklet - Final

  • Read more about TES 2017 System Needs Assessment Summary Booklet - Final

TES 2017 System Needs Assessment summary booklet - Final

TES-2017-System-Needs-Assessment-summary-booklet-final.pdf
EirGrid
Grid Development

Pagination

  • Previous page
  • Current page 67
  • Next page
Subscribe to EirGrid