Skip to main content

Breadcrumb

  1. Back to site
  2. EirGrid
  3. Edit Taxonomy term

EirGrid

2018/19 Approved TLAFs Accompanying Note

  • Read more about 2018/19 Approved TLAFs Accompanying Note

2018/19 Approved TLAFs

1819-Approved-TLAFs-Accompanying-Note-v1.0.pdf
EirGrid

2018/19 Approved TLAFs PDF Version

  • Read more about 2018/19 Approved TLAFs PDF Version

2018/19 Approved TLAFs

1819-Approved-TLAFs-v1.0.pdf
EirGrid

2018/19 Approved TLAFs Excel Version

  • Read more about 2018/19 Approved TLAFs Excel Version

2018/19 Approved TLAFs

Copy-of-1819-Approved-TLAFs-v1.0.xlsx
EirGrid

Transmission Outage Summary 2018 (Week 37-38)

  • Read more about Transmission Outage Summary 2018 (Week 37-38)

Two week summary of transmission outages

Top-Issue-Weeks-37-38-(20180829).pdf
Operations
EirGrid
Transmission

System Non-Synchronous Penetration: Definition and Formulation

  • Read more about System Non-Synchronous Penetration: Definition and Formulation

The SNSP metric was developed to provide a single constraint that captures a range of issues. The metric is deemed a prudent constraint to apply in real-time operation.

SNSP-Formula-External-Publication.pdf
EirGrid
DS3 Programme

TSO Connected Renewable Generation

  • Read more about TSO Connected Renewable Generation

TSO Connected Renewable Generation

TSO-Connected-Renewable-Generation-22.08.18.pdf
EirGrid

Proposal for RfG Banding Thresholds Final Position Paper - Ireland

  • Read more about Proposal for RfG Banding Thresholds Final Position Paper - Ireland

Position Paper for the banding thresholds of the RfG requirements for Ireland.

Proposal-for-RfG-Banding-Thresholds_Final-Position_Ireland.pdf
EirGrid

Cross Shannon Cable Project - Information Brochure Number 1

  • Read more about Cross Shannon Cable Project - Information Brochure Number 1

Information booklet on Cross Shannon Cable Project

Cross-Shannon-Cable-Information-Booklet-Number-1.pdf
EirGrid
Grid Development

Controllability Status Update

  • Read more about Controllability Status Update

Three level hierarchy classification for Wind farms

2018-07-July-Controllability-status-update.pdf
EirGrid
Operations

OSC Recommendations Paper 2018-19

  • Read more about OSC Recommendations Paper 2018-19

Other System Charges Recommendations Paper 2018-19

OSC-18-19-Recommendations-Paper-final-with-responses.pdf
EirGrid

Pagination

  • Previous page
  • Current page 73
  • Next page
Subscribe to EirGrid