EirGrid Monthly Availability Report – August 2018
Generator Monthly Availability
EirGrid-Monthly-Availability-Report-August-2018.pdf
Final list of applications that meet the criteria for the 2018 ECP-1 batch
Report listing eligible 2018 batch applications
2018-Batch-(ECP-1)-Eligible-Applications-Joint-SO-Publication-31.8.18.pdf
DS3 System Services – Recommendation Addendum - Market Ruleset
DS3 System Services – Recommendation Addendum - Market Ruleset
DS3-System-Services-Market-Ruleset-Recommendations-Paper-ADDENDUM-30082018.docx.pdf
2018/19 Approved TLAFs Accompanying Note
2018/19 Approved TLAFs
1819-Approved-TLAFs-Accompanying-Note-v1.0.pdf
2018/19 Approved TLAFs PDF Version
2018/19 Approved TLAFs
1819-Approved-TLAFs-v1.0.pdf
2018/19 Approved TLAFs Excel Version
2018/19 Approved TLAFs
Copy-of-1819-Approved-TLAFs-v1.0.xlsx
Transmission Outage Summary 2018 (Week 37-38)
Two week summary of transmission outages
Top-Issue-Weeks-37-38-(20180829).pdf
System Non-Synchronous Penetration: Definition and Formulation
The SNSP metric was developed to provide a single constraint that captures a range of issues. The metric is deemed a prudent constraint to apply in real-time operation.
SNSP-Formula-External-Publication.pdf
TSO Connected Renewable Generation
TSO Connected Renewable Generation
TSO-Connected-Renewable-Generation-22.08.18.pdf
Proposal for RfG Banding Thresholds Final Position Paper - Ireland
Position Paper for the banding thresholds of the RfG requirements for Ireland.
Proposal-for-RfG-Banding-Thresholds_Final-Position_Ireland.pdf