Skip to main content

Breadcrumb

  1. Back to site
  2. EirGrid
  3. View Publication Categories

EirGrid

Generation and Load Data Provision Methodology Proposal

  • Read more about Generation and Load Data Provision Methodology Proposal

This document is a common proposal developed by all Transmission System Operators regarding the development of a proposal for a generation and load data provision methodology (GLDPM).

GLDPM-v2.pdf
EirGrid
Generation

Membership of the Ireland Grid Code Review Panel - 2018

  • Read more about Membership of the Ireland Grid Code Review Panel - 2018

Membership of the Ireland Grid Code Review Panel 2018

MembershipOfIrelandGridCodeReviewPanel_2018.pdf
Grid Code
EirGrid

FTR Trading Pack 2018

  • Read more about FTR Trading Pack 2018

This document provides customer information about the new I-SEM trading arrangement

FTR-Trading-Pack-2018.pdf
Operations
Customer Information
EirGrid

Transmission Outage Summary 2018 (Week 17-18)

  • Read more about Transmission Outage Summary 2018 (Week 17-18)

Transmission Outage Summary 2018 - (Week 17-18)

Summary-TOP-Weeks-17-18-(2018.04.11).pdf
Transmission
EirGrid

Power Off and Save - Progress Report Two

  • Read more about Power Off and Save - Progress Report Two

A report on the progress made in the EirGrid-Electric Ireland Power Off and Save programme between February 2017 and October 2017

EirGrid-Power-Off-Save-Progress-Report-Two.pdf
EirGrid

Transmission Outage Programme - April 2018

  • Read more about Transmission Outage Programme - April 2018

This document is a list of planned outages for 2018

2018-Transmission-Outage-Programme-(20180406).xlsx
Forecast Statement
Transmission
EirGrid

Transmission Outage Summary 2018 (Week 15-16)

  • Read more about Transmission Outage Summary 2018 (Week 15-16)

Transmission Outage Summary 2018 (Week 15-16)

Summary-TOP-Weeks-15-16-(2018.03.28).pdf
Transmission
EirGrid

Operational Constraints Update - 28 March 2018

  • Read more about Operational Constraints Update - 28 March 2018

Monthly update of all-island system constraints

OperationalConstraintsUpdate28March_2018.pdf
Operations
EirGrid
Constraints Update

TSO Connected Renewable Generation

  • Read more about TSO Connected Renewable Generation

TSO Connected Renewable Generation

TSO-Connected-Renewable-Generation.pdf
Generation
EirGrid

EirGrid North South Interconnector Update - Winter/Spring 2018

  • Read more about EirGrid North South Interconnector Update - Winter/Spring 2018

EirGrid North South Interconnector Update - Winter/Spring 2018

EirGrid-NS-Interconnector-Winter-Update-A4(v2)_F_16.03.17.pdf
North-South 400kV Interconnection Development
EirGrid
Grid Development
Customer Information

Pagination

  • Previous page
  • Current page 81
  • Next page
Subscribe to EirGrid