Stakeholder Engagement Plan 2021
This document summarises EirGrid’s plans for stakeholder
engagement from 2021 onwards
EirGrid and SONI Balancing Market Principles Statement V4.1
Balancing Market Principles Statement (Version 4.1)
Cover note - EirGrid and SONI BMPS V4.1 Consultation
Cover note on the EirGrid and SONI Balancing Market
Principles Statement (BMPS) V4.1 Consultation
110 kV AIS Substation Layout Drawings – 8 Bay (XDN-LAY-ELEV-STND-H-001-R08)
Design standard drawings showing layout of 110 kV AIS 8-
bay substation
Station Auxiliary Power Supplies Functional Specification
Technical specification covering the technical
requirements of the design, supply at site and
installation of substation auxiliary power supplies
Control, Protection and Metering Functional Specification
Technical specification covering the technical
requirements of the design, supply at site, installation
and testing of substation control, protection and metering
equipment.
ECP-2.1 Update - January 2021
Update on ECP-2.1 initial batch November 2020
Engagement process for development and update of technical standards and policies
Engagement process for development and update of technical
standards and policies
2021 Standard Transmission Charges
This document sets out the CRU approved 2021 standard
transmission charges for some asset classes to be used by
EirGrid when issuing offers for connection to the
transmission system. These charges are updated annually
to reflect the change in Harmonised Index of Consumer
Prices as published by the Central Bank of Ireland.
Engage With Us - A Guide for Customers and Industry Stakeholders
A guide to help customers and industry stakeholders
understand key engagement channels and points of contact
within EirGrid