Skip to main content

Breadcrumb

  1. Back to site
  2. EirGrid
  3. Edit Taxonomy term

EirGrid

Kildare-Meath Grid Upgrade - Final Strategic Social Impact Assessment Scoping report

  • Read more about Kildare-Meath Grid Upgrade - Final Strategic Social Impact Assessment Scoping report

Kildare-Meath Grid Upgrade - Final Strategic Social Impact
Assessment Scoping report

Kildare-Meath-Grid-Upgrade-Final-Strategic-Social-Impact-Assessment-Scoping-Report.pdf
EirGrid
Grid Development

Kildare-Meath Grid Upgrade - Spring 2021 Update

  • Read more about Kildare-Meath Grid Upgrade - Spring 2021 Update

Spring 2021 update for the Kildare-Meath Grid Upgrade Project

EirGrid-Kildare-Meath-Grid-Upgrade-Spring-2021-Update.pdf
Grid Development
EirGrid

Celtic Interconnector Community Forum - Terms of Reference

  • Read more about Celtic Interconnector Community Forum - Terms of Reference

Celtic Interconnector Community Forum - Terms of Reference

Celtic-Interconnector-Community-Forum-Terms-of-Reference.pdf
Celtic Interconnector
EirGrid
Grid Development

Celtic Interconnector: Route Options Review In the Vicinity of Churchtown

  • Read more about Celtic Interconnector: Route Options Review In the Vicinity of Churchtown

Celtic Interconnector: Route Options Review In the
Vicinity of Churchtown

Churchtown-Route-MCA-March-2021.pdf
EirGrid
Celtic Interconnector
Grid Development

Other System Charges (OSC) Consultation 2021-2022

  • Read more about Other System Charges (OSC) Consultation 2021-2022

Annual OSC Consultation

Other-System-Charges-(OSC)-Consultation-2021-2022.pdf
Operations
Constraints Update
EirGrid

Contracted TSO (Non Wind) Generators

  • Read more about Contracted TSO (Non Wind) Generators

Contracted TSO (Non Wind) Generators

TSO_NonWind_Contracted.pdf
EirGrid
Generation

Contracted TSO Wind Farms as of 16 March 2021

  • Read more about Contracted TSO Wind Farms as of 16 March 2021

Contracted TSO Wind Farms

TSO_Wind_Contracted.pdf
EirGrid
Generation

Flexible Demand Operating Protocol

  • Read more about Flexible Demand Operating Protocol

This protocol sets out the operational arrangements in
place between the System Operator and the customer for
implementation of Flexible Demand at the customer’s
site(s).

Flexible-Demand-Operating-Protocol.pdf
Customer Information
EirGrid

DSU Test Procedure – Capacity Test – 6 Hours

  • Read more about DSU Test Procedure – Capacity Test – 6 Hours

DSU Test Procedure – Capacity Test – 6 Hours

DSU-Test-Procedure-Aggregate-MW-Capacity-Test-6-Hours.docx
EirGrid
Customer Information

FOI Disclosure Log - EirGrid

  • Read more about FOI Disclosure Log - EirGrid

FOI Disclosure Log - EirGrid

FOI-Disclosure-Log.xlsx
EirGrid
FOI
Other

Pagination

  • Previous page
  • Current page 23
  • Next page
Subscribe to EirGrid