2018 Wind Dispatch Down Report - Qtr 1
2018 Wind Dispatch Down Report - Qtr 1
Transmission Outage Summary 2018 (Week 19-20)
Report covers outages commencing/returning/spanning the period: 07/05/2018 - 20/05/2018
DS3 System Services Regulated Arrangement for Volume Uncapped Phase 2 Bidders Conference Presentation Slides
Presentation slides from the DS3 System Services Regulated Arrangement for Volume Uncapped Phase 2 Bidders conference
Procurement Category Figures over 20,000 - Q2 2018
Procurement Category Figures over 20,000 - Q2 2018
ECP-1 Generation Facilities Application Form - word
Word version of ECP-1 Generation Facilities application form
ECP-1 Generation Facilities Reduced Criteria Application Form - word
Word version of ECP-1 Generation Facilities Reduced Criteria application form.
Enduring Connection Policy (ECP-1) – System Operator Information Note
Enduring Connection Policy (ECP-1) – System Operator Information Note
Generation and Load Data Provision Methodology Proposal
This document is a common proposal developed by all Transmission System Operators regarding the development of a proposal for a generation and load data provision methodology (GLDPM).
Membership of the Ireland Grid Code Review Panel - 2018
Membership of the Ireland Grid Code Review Panel 2018
FTR Trading Pack 2018
This document provides customer information about the new I-SEM trading arrangement