EirGrid Group All-Island Generation Capacity Statement 2019-2028
EirGrid Group All-Island Generation Capacity Statement 2019-
2028
All-Island Ten Year Transmission Forecast Statement 2018
The All-Island Ten Year Transmission Forecast Statement
(TYTFS) describes and presents technical network data such
as the network configuration, network parameters, generation
connections and power flows, and fault levels for future
network conditions. This enables the reader to carry out
their own network analysis if they wish. In addition, the
TYTFS outlines opportunities for demand and generation
connections in Ireland and Northern Ireland.
The TYTFS forms part of SONI’s and EirGrid’s statutory and
licence obligations.
Transmission Development Plan 2018-2027
The Transmission Development Plan sets out the transmission projects we are developing or intending to develop for the period of the plan. It also contains information about the needs and drivers of the projects.
Investment Planning and Delivery Report 2017
Joint TSO/TAO Report setting out EirGrid and ESBN’s performance in planning investments and ultimately delivering transmission system projects in 2017
Joint TSO & TAO Electricity Transmission Performance Report 2017
Joint TSO/TAO Report setting out EirGrid and ESBN’s performance in developing, operating and maintaining the transmission system
Statement of Charges 18-19 FAQ
Statement of Charges 2018/19 Frequently Asked Questions v1.0
All-Island Ten Year Transmission Forecast Statement 2017 - Study Files
These are the study files to accompany All-Island Ten Year Transmission Forecast Statement (TYTFS) 2017.
Winter Outlook 2018-19
The EirGrid Group Winter Outlook is an annual summary that
provides information on expected electricity demand and capacity margin on an all-island basis.