TSO Wind Contracted - 28/10/2022
TSO Wind Contracted - 28.10.2022
EirGrid TSO Compliance and Assurance Officer Report 2021
Condition 21A of EirGrid’s Transmission System Operator
Licence (the Licence) requires the Compliance &
Assurance Officer to report at least annually to the
directors of the Licensee on his activities during the
period covered by the report and the investigations he has
conducted and shall specifically include the
Compliance & Assurance Officer’s assessment of the
compliance of the Licensee with the requirements of
Conditions
ORESS 1 Auction Timetable (OR1AT)
Provisional ORESS 1 Auction Timetable
CP1121 Great Island Lodgewood & Arklow Lodgewood Tower Painting & Miscellaneous works
Counties Wicklow and Wexford [Exempted Development]
Assessment of Tufa Springs
IE Consulting assessment of the Tufa springs and Tufa Deposits
on and adjacent to the proposed ESB substation at Coolnabacky,
Co. Laois.
EirGrid Powering Up Dublin Information Brochure
EirGrid is planning a major, multi-year upgrade of the
Dublin electricity grid in order to facilitate Government
renewable energy targets and meet growing demand in the
capital.
This involves installing up to 50km of cables across the
city. Some cables will replace existing cables and some will
be new. We will also upgrade some electricity substations
and build new substations to support Dublin’s electricity
network.
Fault Ride Through Study Template v2.1
This document is a minor update to the template for the
submission of Fault Ride-Through Studies.