System Margins Outlook Report 23.12
The System Margins Outlook Report will be published every Monday and Friday, excluding bank holidays. The report will provide market participants with information on the anticipated availability of dispatchable generation capacity to meet peak demand each day over the week ahead; the average and lower confidence renewables forecast; and the availability of the East-West Interconnector and the Moyle Interconnector with Great Britain to support trades - should these be required to meet power system requirements when renewable and dispatchable generation are inadequate.
Operational Policy Roadmap 2023-2030
This operational policy roadmap sets out our plan to 2030 to
accommodate continued growth in variable, non-synchronous
renewable generation. It outlines the context, drivers,
timelines, milestones, actions, and stakeholder impacts that
are needed in each operational policy area to achieve the
ambition of the governments’ decarbonisation targets for the
electricity sector.
CP1272 Derryiron Temporary Bypass [Exempted Development] (County Offaly)
Appropriate Assessment Screening Determination
Draft Annual Electricity Transmission Performance Report 2021
Publication of the Draft Annual Electricity Transmission Performance Report 2021.
TSO Wind Contracted - 28/10/2022
TSO Wind Contracted - 28.10.2022
EirGrid TSO Compliance and Assurance Officer Report 2021
Condition 21A of EirGrid’s Transmission System Operator
Licence (the Licence) requires the Compliance &
Assurance Officer to report at least annually to the
directors of the Licensee on his activities during the
period covered by the report and the investigations he has
conducted and shall specifically include the
Compliance & Assurance Officer’s assessment of the
compliance of the Licensee with the requirements of
Conditions