Skip to main content

Breadcrumb

  1. Back to site
  2. EirGrid
  3. View Publication Categories

EirGrid

Pre Network Code Derogation Application Form – Non Windfarm PPM Plant/System

  • Read more about Pre Network Code Derogation Application Form – Non Windfarm PPM Plant/System

​GC9-1 Non Network Codes Plant, BESS or SCU Derogation Application Form

Customer Information
EirGrid
Generation

Methodology for sharing costs incurred to ensure firmness and remuneration of long-term transmission rights

  • Read more about Methodology for sharing costs incurred to ensure firmness and remuneration of long-term transmission rights

ACER approved document

ACER-Decision-25-2020-on-the-FCA-FRC-Methodology-Annex-I.pdf
Customer Information
EirGrid

EirGrid TSO Annual Compliance Report 2019

  • Read more about EirGrid TSO Annual Compliance Report 2019

Annual report specifying the measures taken and the level of compliance to ensure that discriminatory conduct by it or its employees is prevented

EirGrid-TSO-Annual-Compliance-Report-2019.pdf
EirGrid
TSO Regulatory Publications
2019

EirGrid TSO Annual Compliance Report 2018

  • Read more about EirGrid TSO Annual Compliance Report 2018

TSO Annual Compliance Report 2018

EirGrid-TSO-Annual-Compliance-Report-2018.pdf
TSO Regulatory Publications
2018
EirGrid

Annual Protected Disclosures Report 2019/2020

  • Read more about Annual Protected Disclosures Report 2019/2020

Annual Protected Disclosures Report 2019/2020

Section-22-Protected-Disclosures-Annual-Report-2020.pdf
EirGrid

Operational Constraints Update – November 2020

  • Read more about Operational Constraints Update – November 2020

Monthly update of all island system constraints

OperationalConstraintsUpdateVersion1_100_November_2020_Final.pdf
Operations
EirGrid

Celtic Interconnector - Step 4 Overview

  • Read more about Celtic Interconnector - Step 4 Overview

Celtic Interconnector - Step 4 Overview

Celtic-Interconnector-Step-4-Overview.pdf
Celtic Interconnector
Grid Development
EirGrid

Celtic Interconnector - Step 4b Brochure (Winter 2020)

  • Read more about Celtic Interconnector - Step 4b Brochure (Winter 2020)

Celtic Interconnector - Step 4b Brochure (Winter 2020)

Celtic-Interconnector-Step-4b-Brochure-(Winter-2020).pdf
Grid Development
Celtic Interconnector
EirGrid

WFPS OR Test Procedure Template

  • Read more about WFPS OR Test Procedure Template

Test Procedure Template for WFPS wishing to apply for a DS3
System Services Operating Reserve Contract

WFPS-OR-test-procedure-template.docx
DS3 Programme
EirGrid
System Services

Celtic Interconnector - Step 4B Consultant’s Development Options Report

  • Read more about Celtic Interconnector - Step 4B Consultant’s Development Options Report

Celtic Interconnector - Step 4B Consultant’s Development Options
Report

Celtic-Interconnector-Project-Step-4B-Report.pdf
Grid Development
EirGrid
Celtic Interconnector

Pagination

  • Previous page
  • Current page 30
  • Next page
Subscribe to EirGrid