Pre Network Code Derogation Application Form – Non Windfarm PPM Plant/System
GC9-1 Non Network Codes Plant, BESS or SCU Derogation Application Form
Methodology for sharing costs incurred to ensure firmness and remuneration of long-term transmission rights
ACER approved document
ACER-Decision-25-2020-on-the-FCA-FRC-Methodology-Annex-I.pdf
EirGrid TSO Annual Compliance Report 2019
Annual report specifying the measures taken and the level of compliance to ensure that discriminatory conduct by it or its employees is prevented
EirGrid-TSO-Annual-Compliance-Report-2019.pdf
EirGrid TSO Annual Compliance Report 2018
TSO Annual Compliance Report 2018
EirGrid-TSO-Annual-Compliance-Report-2018.pdf
Annual Protected Disclosures Report 2019/2020
Annual Protected Disclosures Report 2019/2020
Section-22-Protected-Disclosures-Annual-Report-2020.pdf
Operational Constraints Update – November 2020
Monthly update of all island system constraints
OperationalConstraintsUpdateVersion1_100_November_2020_Final.pdf
Celtic Interconnector - Step 4 Overview
Celtic Interconnector - Step 4 Overview
Celtic-Interconnector-Step-4-Overview.pdf
Celtic Interconnector - Step 4b Brochure (Winter 2020)
Celtic Interconnector - Step 4b Brochure (Winter 2020)
Celtic-Interconnector-Step-4b-Brochure-(Winter-2020).pdf
WFPS OR Test Procedure Template
Test Procedure Template for WFPS wishing to apply for a DS3
System Services Operating Reserve Contract
WFPS-OR-test-procedure-template.docx
Celtic Interconnector - Step 4B Consultant’s Development Options Report
Celtic Interconnector - Step 4B Consultant’s Development Options
Report
Celtic-Interconnector-Project-Step-4B-Report.pdf